PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing Stairs -2 Facing West (800x600).jpg Metal decking at Derricks 4-6 (4th Floor) Facing East (800x600).jpg Metal decking at the roof Facing South (800x600).jpg Started installing metal decking at the lower Roof Facing South (800x600).jpg Underground piping at the Boiler Room Facing North-West (800x600).jpg Welding the moment connections at the roof Facing East (800x600).jpg Finished the underground piping at Toilet Room 122 Facing South (800x600).jpg
Previous pageNext page Underground piping at the Boiler Room Facing North-West (800x600)
Underground piping at the Boiler Room Facing North-West (800x600)